Peguform
The projects peformed for Peguform consisted of consulting, engineering, manufacturing and the installation involving all QMC systems, the coordination between customer, machine manufacturer and mold maker, as well as the installation of all QMC related solutions.
EAS was able to help this customer to reduce the changeover time for 40 ton moulds to less than 10 minutes – instead of the 120 minutes it took earlier by using conventional mold change methods.